Last edited by a moderator:
Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
Last update 31st Jan stated August previous to that it was July so who knows. Get all excited and login with nothing showing FFSI’ve tried it a few times and nothing showing. Will try again before I give up lol
My iPad struggled but it worked on a desktop PC……Last update 31st Jan stated August previous to that it was July so who knows. Get all excited and login with nothing showing FFS
I never did hear back from CS so in the end I just went with my original choice of Seneca. No idea on expected delivery yet.Interested to know the answer to this one. Exciting though after such a long wait..
I paid a reservation fee in Feb 2023 for an i4 after a test drive in a manual, and have been told q2/q3 2024 by CC. If that comes off I will consider myself very lucky! I have decided to wait for the i4 base configurator (July 2023?) to see if the 10k extra for FE is worth it (to me). If not, I will switch to i4 base immediately as switching to i4 base means a new queue to join apparently. I must say, as a lotus newbie, this whole process feels sub optimal to say the least.Last update 31st Jan stated August previous to that it was July so who knows. Get all excited and login with nothing showing FFS
Had exactly the same experience this last week. Tried calling CS twice, selected call back but nobody has. Then tried Live Chat, no agents available. So called JCT600 who offered to phone Lotus and call me back, no call yet. Finally called into JCT600 who gave me an email address.I also received the I4 configurator invite email last week. I clicked the "Request your payment link" button which generated an empty email to customer support with the title "Lotus Emira configuration fee link request" but I've had nothing back since and the supposed deadline is end of today. I assume things are in hand but I thought it odd as no one else mentioned this step, just going straight into the configurator?
I've chased CS today to query next steps and also to ask when the deposits become non-returnable. I am happy to configure my spec but I don't want to commit without a test drive and ideally some early reviews. I placed my original £2K deposit in August 2021 and I still don't really have much of an idea on when it's likely to be ready.
How is it that CS is MIA on all fronts?Had exactly the same experience this last week. Tried calling CS twice, selected call back but nobody has. Then tried Live Chat, no agents available. So called JCT600 who offered to phone Lotus and call me back, no call yet. Finally called into JCT600 who gave me an email address.
I’ve had better customer service!!
(14/7/21 deposit - i4 Base if I live longer enough)
China, China, ChinaHow is it that CS is MIA on all fronts?
Lights out and even dealers left in the dark (as in Verdant).
Has all the headway been waylaid?
At least those doing factory tours report manufacturing activity.
Great info. Adds even more to my thoughts that the V6 manual Emira is on its way out by 2025/26 I'm afraid. (v6 replaced by Type 135?)I saw a bunch of 2.0 i4s at Hethel a few days ago, all production and badged Lotus NYO. Hearing great things about the i4, handling and performance and no cooling issues as rumored. I'm currently a V6 owner, tempted to put a deposit on an i4 now, though super happy with the V6.
oh yes and the i4 is quicker to build than the V6 since the engine and DCT goes straight in, vs the V6 that needs a lot of stripping down and modification.
Would that mean no S and R manual transmission? UghGreat info. Adds even more to my thoughts that the V6 manual Emira is on its way out by 2025/26 I'm afraid. (v6 replaced by Type 135?)
I think this i4 powertrain if done correctly will be very impressive performance wise when cranked up in the "s" and "r" variants. Even it base format will surely be very quick car.
I personally don’t think so. Obviously I don’t really know. But with them being so behind and with so many orders to fulfill I don’t think they are going to re certify the V6 for more power. I don’t even know if it could pass emissions in 2025 with a power upgrade. Looks like i4 will be the one to get upgraded versions going forward. IMOWould that mean no S and R manual transmission? Ugh
Faith is all we have. Doesn't cost us much either. ️Lotus has a 2+ year order backlog and is trying to switch to an entirely EV lineup. I continue to be confused by people’s faith in upcoming S/R variants. What’s the motivation for Lotus? They’re already selling more than they can build.
Projects like this sometimes have momentum. If it was already planned, then it will continue until there is a reason to terminate it. Also, I believe it will be a point of pride for the enthusiasts in Lotus. Geely can also tell them to stop, which is a possibility if the leadership there loses patience and believe the S/R models to be a pointless distraction.Lotus has a 2+ year order backlog and is trying to switch to an entirely EV lineup. I continue to be confused by people’s faith in upcoming S/R variants. What’s the motivation for Lotus? They’re already selling more than they can build.