My wife and I went to see the demonstrator at JCT600 in Bradford. We were extremely impressed upon seeing the car in the flesh and it looks a lot bigger (and more substantial) than it does in photos and videos. The interior fit and finish looked excellent too. Placed our deposit on the 19th of January and have had the automated email from Lotus.
From what I've read on this site it looks like we're in for a long wait for delivery - maybe until late 2024?
However, I remember Matt Windle telling Harry Metcalfe in his video that they intended to add a second shift (and, he claimed, the extra people that could be seen on the production line, were part of that new employment drive needed to run it). That video was posted 3 months ago and yet, having looked at quite a few of the forums here I haven't heard the 2nd shift mentioned.
If they are still waiting to set that up, surely, when they do, that will drastically shorten the ETA.